Job offers

Commissioning Supervisor for Wind Farm Installation Vessel

Role Objective:

  • Support OWF owner’s site organisation with being consultancy for the supervision of the WTG testing, test run and grid connection in commissioning phase.

Details:

  • Duties: Client rep;
  • Vessel: Wind Farm Installation;
  • Start: End of May;
  • Location: Taiwan;
  • Project duration: 5-7 month contract;

Requirements:

  • Offshore certificates relevant to the position;
  • Minimum 5 years professional experience from a similar job;
  • MSc/BSc in Mechanical or Electrical engineering;
  • Valid STCW certificates;
  • Valid MLC medical;
  • Offshore Medical;
  • Good references.
Type of vessel

Type of vessel

Wind Farm Installation

departure date

Starting date

28/05/2021

bag

Required employees

work hours

Duration

5-7 months

work hours

Expiration date

28/02/2022

location

Location

Taiwan

Nr

4427

MORE ABOUT US

USEFUL INFORMATION

Jan De Nul Orders Imeca Pile Gripper for Les Alizés

Jan De Nul Orders Imeca Pile Gripper for Les Alizés

Read more