Apply for a job offer

Commissioning Supervisor for Wind Farm Installation Vessel

Role Objective:

  • Support OWF owner’s site organisation with being consultancy for the supervision of the WTG testing, test run and grid connection in commissioning phase.

Details:

  • Duties: Client rep;
  • Vessel: Wind Farm Installation;
  • Start: End of May;
  • Location: Taiwan;
  • Project duration: 5-7 month contract;

Requirements:

  • Offshore certificates relevant to the position;
  • Minimum 5 years professional experience from a similar job;
  • MSc/BSc in Mechanical or Electrical engineering;
  • Valid STCW certificates;
  • Valid MLC medical;
  • Offshore Medical;
  • Good references.
Type of vessel

Type of vessel

Wind Farm Installation

departure date

Starting date

28/05/2021

location

Location

Taiwan

Nr

4427

UPLOAD CV

    Registration terms
    1

    Choose a job offer

    2

    Sign up in our system

    3

    Get the offer that suits you

    4

    Get a job

    10 years together

    Our partners

    N-SEA logo
    Allseas-logo
    Boskalis-logo
    DEME-logo
    Jumbo-Maritime-Logo
    Jan-de-Nul-logo
    JUB-Logo
    Mareema Marine Contractors
    Van-Oord-logo