Job offers

Roughneck

We are currently looking for a Roughneck that can work on the Drilling Jack-Up. The project is for 3 years and the candidate must commit for the whole time.

Details:

  • Start: 08.12.2021
  • Rotation: 3:3 rotation and after covid, it will be a 2:2 rotation.
  • Duration: 3 years

Requirements:

  • Medical + Breathing apparatus examination fitness Certificate
  • offshore Safety Introd. and Emergency Response Training (BOSIET). Refresher: book Nogepa 0.5b+c /FOET+CA-EBS
  • Banksman Offshore NOGEPA 1.9
  • Member Fire-fighting and Rescue Team Offshore  
  • Basic Elements of Safety SCC = VCA-basis or MIST
  • Working at Heights
  • Forklift Driver
  • Scaffolding – lightweight aluminum <5m
Type of vessel

Type of vessel

Drilling Jack-up

departure date

Starting date

08/12/2021

bag

Required employees

work hours

Duration

3 Years

work hours

Expiration date

10/12/2021

location

Location

Europe

Nr

4960

MORE ABOUT US

USEFUL INFORMATION

Recyclable Wind Turbine Blades to Spin Offshore the Netherlands

Recyclable Wind Turbine Blades to Spin Offshore the Netherlands

Read more
First Turbine Installed at World’s Largest Floating Offshore Wind Farm

First Turbine Installed at World’s Largest Floating Offshore Wind Farm

Read more
The angriest seas in the world

The angriest seas in the world

Read more
Wind turbine blades longevity

Wind turbine blades longevity

Read more
Will Offshore Wind Ever Rule The World And Shape The Future?

Will Offshore Wind Ever Rule The World And Shape The Future?

Read more