Rigger with Scaffolding and Cable Pull experience
Details:
- Position: Rigger;
- Vessel: Cable layer;
- Start: 12/06/2021;
- Duration: approx. 2 months;
- Location: Taiwan;
Requirements:
- Previous experience with Cable Pull and Scaffolding;
- OPITO Rigging certificate;
- OIPTO BOSIET + CA-EBS:
- 5 GWO modules;
- Scaffolding card;
- Security Awareness;
- Seaman’s book;
- MLC medical certificate;
- Offshore medical certificate;
- Fluent English;
- Good references.

Type of vessel
Cable laying vessel

Starting date
12/06/2021

Required employees

Duration
2 months

Expiration date
31/10/2021

Location
Taiwan
MORE ABOUT US
USEFUL INFORMATION

Recyclable Wind Turbine Blades to Spin Offshore the Netherlands
Read more

First Turbine Installed at World’s Largest Floating Offshore Wind Farm
Read more

Will Offshore Wind Ever Rule The World And Shape The Future?
Read more