Job offers

AB for Offshore Installation Vessel

Details:

  • Function: Able Seaman II/4;
  • Vessel: DP2 offshore installation;
  • Location: UK;
  • Start date: 04/01/2022;
  • End: 01/02/2022;

Requirements:

  • National COC;
  • STCW certificates;
  • National Seaman’s book;
  • Seafarers medical certificate;
  • BOSIET incl. CA-EBS;
  • XBR Shoulder measurement;
  • GWO Working at Heights;
  • GWO Sea Survival;
  • OPITO Offshore Crane op. stage 2 or similar;
  • COVID-19 full vaccination;
  • UK Frontier Work Permit;
  • Good references.
Type of vessel

Type of vessel

Offshore Installation Vessel

departure date

Starting date

04/01/2022

bag

Required employees

1

work hours

Duration

4 Weeks

work hours

Expiration date

01/06/2022

location

Location

United Kingdom

Nr

5040

MORE ABOUT US

USEFUL INFORMATION

Recyclable Wind Turbine Blades to Spin Offshore the Netherlands

Recyclable Wind Turbine Blades to Spin Offshore the Netherlands

Read more
First Turbine Installed at World’s Largest Floating Offshore Wind Farm

First Turbine Installed at World’s Largest Floating Offshore Wind Farm

Read more
The angriest seas in the world

The angriest seas in the world

Read more
Wind turbine blades longevity

Wind turbine blades longevity

Read more
Will Offshore Wind Ever Rule The World And Shape The Future?

Will Offshore Wind Ever Rule The World And Shape The Future?

Read more