AB and DPO for Cable Layer
Details:
- Start: 28/06/2021;
- Untill: 31/07/2021;
- Location: Europe;
- Vessel: Cable layer;
Requirements:
- National COC;
- National Seaman’s book;
- Experience in offshore and in the same position;
- Valid STCW papers;
- MLC medical;
- OGUK medical;
- Fluent English;
- Good references.

Type of vessel
Cable laying vessel

Starting date
28/06/2021

Required employees
4

Duration
1 month

Expiration date
30/09/2021

Location
Europe
MORE ABOUT US
USEFUL INFORMATION

Recyclable Wind Turbine Blades to Spin Offshore the Netherlands
Read more

First Turbine Installed at World’s Largest Floating Offshore Wind Farm
Read more

Will Offshore Wind Ever Rule The World And Shape The Future?
Read more