
We are looking for a Steward to work on a Fallpipe vessel.

For the next rotation, we are looking for a team of Riggers, beginners are also accepted.

We are urgently looking for 16x Riggers & 4x Foreman on an Offshore Support Vessel.

We are urgently looking for an experienced Third Engineer, who could join ASAP.

Construction works on the 496 MW Saint-Brieuc offshore wind farm are now resuming, the developer Ailes Marines informed on 7 March, saying the installation vessel Aeolus will be working at the site without interruption in 2022 and 2023. According to the vessel’s AIS data, Van Oord’s jack-up was at the Saint-Brieuc offshore wind farm site today, 7 ...

We are looking for experienced Welder for Cutter Suction Dredger ASAP. Details Vessel: Cutter Suction Dredger; Position: Welder; Start: 18/02/2022; Duration: 6 weeks; Location: France; Requirements Welder’s certificate; Valid STCW certificates; MLC Medical certificate; Candidate must be fully covid-19 vaccinated; Fluent English; European Union passport. Check other job offers! 👉OFFERS Can’t find suitable vacancies? Contact ...

Currently, we are looking for an AB for one of our Clients.

Project is located in France, Onshore. Candidates would start working in November 2021 (The exact date will be updated).

We are urgently looking for the following candidates for Split Hopper Barge: Ch. officer, Ch. engineer, 2nd engineer, Oiler, AB.

Van Oord’s jack-up vessel Aeolus is set to return to the Saint-Brieuc offshore wind farm site in France, after halting the construction work last month due to a leak of hydraulic fluid in the drilling equipment. The vessel’s return to the project site in France was announced by Ailes Marines, the 496 MW offshore wind farm developer, ...